House-museum in Aralsk built with VELOX technology

VELOX KZ — since 2014

Monolithic houses in permanent formwork

House-museum in Aralsk, 210 m²: turnkey, finishing included, in 47 working days.

25+ yearsin construction
100,000 m²of construction and finishing works of varying complexity
up to 45working days for a monolithic shell ready for finishing
9-pointseismic design of every building, whatever the region
TUTO

Our main direction

Homes and communities with no connection to centralised utility networks

We build VELOX homes with no connection to centralised utility networks: power, heat, water and wastewater treatment are provided within the site boundary, so we can build where there are no networks. The first community, Gorodok, is already under way.

Energy

Solar panels on the roof and facade, battery storage, a reserve source for winter

Heat

Heat pumps instead of gas, a warm monolithic building envelope

Water

Own well and water treatment based on on-site water analysis

Wastewater

Biological treatment on site; treated water is used for irrigation

Each home is run by a single building management system with a mobile app. TUTO is a registered trademark in Kazakhstan.

Our projects in Kazakhstan

7 buildings with VELOX technology, 2,430 m². All timeframes are in working days.

House-museum in Aralsk

Aralsk

Nurpeisov house-museum, 210 m²

Turnkey in 47 working days

Office and house in Akzhar, Almaty

Akzhar, Almaty

Office 600 m² and house 600 m²

Shells ready for finishing in 37 working days

House in Tuzdybastau under the roof, 2015

Tuzdybastau

House, 280 m²

Shell standing unfinished since 2015

House in Koyankus

Koyankus

House, 130 m², 2023

All construction stages below

Also: Kyzylorda — house, 450 m²; Almaty — house, 160 m².

House shell in Tuzdybastau, spring 2020Photo from 2020

Five winters unfinished

The shell in Tuzdybastau went up in summer 2015. In spring 2020 we came back and filmed it: the walls stand exactly as we left them. In 2023 it was still there.

How we build

A house in Koyankus, 2023: from foundation to roof.

Finished foundation
01

Foundation

Reinforced monolithic slab

Pouring the walls
02

Walls

VELOX formwork assembled and filled with concrete

Finished shell
03

Shell

Floor slab and monolithic frame

House with roof
04

Roof

Ready for finishing

Ground-floor monolithic shell in AkzharShell of the Aralsk house-museum

VELOX

VELOX technology

Permanent formwork made of wood-chip cement boards. Concrete is poured inside; the boards stay in the wall and act as insulation.

  • Monolithic reinforced-concrete walls
  • Straight walls and true corners
  • No temporary formwork to assemble or strip
Structural analysis — KazNIISSA (now KazNIISA JSC)Two-storey house, Akzhar, 2012 · 9-point seismic →

VELOX houses in Russia

Built by other construction companies using the VELOX system: St Petersburg, Leningrad and Moscow regions.

Two-storey house, Leningrad region

Leningrad region

Two-storey house

Two-storey house, Savoya estate

Savoya estate

Two-storey house

Two-storey house, Lomonosov district

Lomonosov district, Leningrad region

Two-storey house

House, Leningrad region

Leningrad region

Two-storey house

Two-storey house, Vsevolozhsk district

Vsevolozhsk district, Leningrad region

Two-storey house

Single-storey house, Dontsovo village

Dontsovo village

Single-storey house

All VELOX homes in Russia →

VELOX technology worldwide

In Austria, where the system was born, it is used for residential quarters and apartment buildings.

Green Tower residential quarter, Graz

Graz, Green Tower and Esplanade 7

Reininghaus residential quarter, completed

Residential building in Klagenfurt-Harbach

Klagenfurt, Harbach

Residential park, 104 apartments

Residential building on Laudongasse, Graz

Graz, Laudongasse

44 apartments and commercial space

MS32 residential building, Klagenfurt

Klagenfurt, MS32

Apartment building, shell

Photos: VELOX, Austria

House design catalogue →

Team

Team and partners

The people responsible for the technology, architecture and seismic safety of our buildings.

Sergey Tregubenko

Sergey Tregubenko

Founder of VELOX KZ and TUTO

More than 25 years in construction, over 100,000 m² of construction and finishing works. Has led VELOX KZ since 2014. Founder of TUTO Off-Grid Development Ltd (AIFC).

Sergey Glebov

Sergey Glebov

Architect, project partner

Took part in developing unique earthquake-resistant structures. More than 120 completed projects across the former USSR: private houses, townhouses and low-rise residential complexes.

Anvar Shapanov

Anvar Shapanov

Candidate of Technical Sciences (PhD), project partner

Designer, engineer and scientist; member of the Union of Architects of Kazakhstan and the Union of Urban Planners of Kazakhstan. Around 200 residential, public and engineering projects designed and around 30 scientific papers, including the monograph “A Historical Review of Earthquake-Resistant Construction in Kazakhstan in the Era of Academician T.Zh. Zhunusov”.

FAQ

Questions and answers

How long have you been building?

VELOX KZ has been operating since 2014. Seven buildings have been built in Kazakhstan using VELOX technology.

What is VELOX permanent formwork?

Walls are assembled from formwork panels and filled with reinforced concrete. The panels are not removed: they stay as part of the wall. The result is a monolithic house.

Will the house withstand an earthquake?

Structures are designed for magnitude 9 seismic loads.

How long does construction take?

We give timelines in working days once your house has been estimated. Example: the house-museum in Aralsk, 210 m², was handed over turnkey with finishing in 47 working days.

How much does a house cost?

The cost depends on the floor area, location and design, so we do not publish general prices. Send us the floor area and location and we will reply with an estimate and timeline based on our projects.

Can a house be built without connection to centralised utility networks?

Yes, this is our main direction — TUTO: own solar generation with storage, heat pumps, a private well and biological treatment with no wastewater discharge.

How do I start?

Send the floor area and location via WhatsApp or to sergey@tutooffgrid.com. We will reply with an estimate and timeline.

Get a quote

Tell us the floor area and location — we will send a quote and timeline based on our projects.

Office3 Baisultanov St, Akzhar, Almaty
By clicking the button, you agree to the Privacy Policy and consent to the processing of your personal data, including its cross-border transfer.
TUTO

Homes and communities with no connection to centralised utility networks

Our main direction. The first community, Gorodok, is already under way.

Go to the TUTO website →